Tuesday, February 24, 2009

Underground and Overhead

Framing of the Light Monitor is nearly complete.






















Plumbing rough in work being installed at the new Lobby restrooms.





















New Fire Sprinkler detector check assembly is complete.






















Site Demolition has begun on new planters at Service Entrance.





Posted by Picasa

Tuesday, February 10, 2009

Light Monitor Framing, HVAC, and Metal Studs

Now that the wet weather has passed, work on the roof is progressing. In addition, some of the TI interior work has started including the HVAC and metal stud framing.

Light monitor framing.

































HVAC duct mains and perimeter wall furring at Business Development.



















Closeup view of the cable tensioning system at the glu-lam beams.





















View from the Lobby looking down the spine with new light monitor being framed in.




























Posted by Picasa

Wednesday, January 28, 2009

Brace Frames & Light Monitor

The enormous new structural brace frames have arrived and work has begun to start installing them. In addition, the demolition of the roof to create the new light monitor has also begun.

New brace frame at the Lobby.



























Darren, Greg, Mike, Mark, and Ken supervising.





















The brace frame almost completed.



























Current view from the Lobby looking down the spine.



























The rooftop heat pump HVAC units were set using a helicopter to lift them onto the roof.





















The future 10Kw photovoltaic solar system.


Posted by Picasa

Friday, January 9, 2009

Structural Upgrades Continue

Work is still progressing with the Shell & Core work. Structural work is being put up almost as fast as the concrete panels are being torn down to create the new openings.

Concrete panel is being demolished to create the new main entrance.





















New main entrance from Business Development.



























Steel MC Channels to be installed in the roof structure.



























Some of the roof structure upgrades performed by Archibald Timber Structures.

Posted by Picasa

Thursday, December 18, 2008

Concrete Placement

The footings are ready and the concrete is flowing.

Concrete truck parked in accounting.



















Pouring brace frame footing in accounting.



















Service corridor entrance being demolished.



























Old balcony at mezzanine being infilled for Doug's Office.

Posted by Picasa

Wednesday, December 10, 2008

Continuing Shell & Core

Work continues on the Shell & Core structural work. Archibald Timber Structures has been installing a large amount of framing hardware in the roof to make the building much safer to work in. This has not gone without a hitch though, as we have discovered quite a few discrepancies between the original roof design and what was actually installed by the original builder. This has required quite a bit of modifications to our structural design to make everything fit properly. In addition, much of the footing work has been progressing.

Warehouse brace frame footing excavated.




























Accounting brace frame footing excavated.



























Steel frames at new Business Development windows.






















Lobby brace frame footing excavated and new bathroom slab removed.




















Anchor bolts for brace frames.






Posted by Picasa

Thursday, November 20, 2008

Beginning of Shell and Core Work

Another quick update on what's going on at the new Bernards Headquarters. Contracts went out to the Shell and Core Subcontractors which will be KAR Construction for Concrete and two Subs who are new to Bernards. Archibald Timber Structures will handle the panelized roofing and Richwell Steel will have the structural/misc. steel. We continue the demolition removing the upper mezzanine storefront, some site structures and trees and some additional interior elements. The office mock-up is complete and Archibald has begun work on the seismic roof upgrades.

A view from the main gate.





















Doug and Greg's offices with new ventilation





















The new office mock-up.





















Removal of vegetation to increase the views to the park




















What people see when they enter San Fernando

Posted by Picasa