New brace frame at the Lobby.
Darren, Greg, Mike, Mark, and Ken supervising.
The brace frame almost completed.
Current view from the Lobby looking down the spine.
The rooftop heat pump HVAC units were set using a helicopter to lift them onto the roof.
The future 10Kw photovoltaic solar system.
No comments:
Post a Comment