CIP Concrete Slab on Grade is poured back in. Ken is making sure it cures properly.
A current view from the lobby down the main Spine.
Framing has begun on the Operations offices.
The ceiling insulation is almost completed with the black scrim covering.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment